

Estimates for construction projects are regulated by an array of standards and factors. There are a number of points of view that have to be weighed in determining the cost of estimates. Let’s take the means through which Building Estimating UK manages to be flexible for its clients.


This pack is targeted for smaller projects or a first meeting and contains: Estimate of basic materials needed for the project An estimate of labour costs for up to 3 trades An estimated timeline and a proposed schedule of activities Preliminary risk assessment


Included in the previous package that was exclusively for small to average scope projects, this scope of work markup is tailored to meet the needs of medium-sized projects as it is the standard package and contains: Detailed Breakdown of materials needed during the project An estimate of labor cost alongside actual subcontractors Comprehensive schedule and time plan There’s some cost estimating pertaining to risk The cost-benefit analysis also uses cost estimation as an example


As a rule of thumb, this package has been developed for larger projects. As such, this is created when one could expect large-scale construction projects where the package has to consider all possible factors. This project has the following inclusions: Construction estimates for a wide set of factors, materials, labour, subcontractors, etc. Setting of the entire project schedule consisting of target as well as timeline. A comprehensive outline of risks as well as funding that is to be allocated for emergencies. Energy-efficient system estimates with regards to the project’s requirements. Bid preparation with the outlying content of the package A follow-up about the budget and various strategies of overseeing it.
Every construction project is unique because it is fundamentally determined by its working parameters and factors.
If your project has a certain scope in terms of accuracy or specialization, please give us a call, as we could prepare a tailored package specifically for your project needs. The figures quoted are strictly guidelines. Contact us for a customized quote based on the particulars of your project.
Consultation Fee: $100/hour
Revisions to Estimate (After Initial Delivery): $75 per revision
Energy-Efficient System Estimates: Available upon request (additional cost based on project complexity)
Office Location
138 Stroud Crescent SW15 3EH, Central London